Inside the City of Lake Charles, a new home needs a building permit, and the city's Permit Center issues it only after it reviews and approves a complete digital set of plans. Outside city limits a different office may cover your address, so we check with the city or parish office that covers it before work starts, and when a permit's needed, we handle the paperwork or walk you through it.
The ground here is the bigger story. An older parish soil survey rates one of the soils mapped here as poorly suited to development because it stays wet and shrinks and swells a lot, and says foundations on it need drainage and a design that makes up for that movement. Flooding matters too, since the parish reports 46% of its land sits in a high-risk flood hazard area. FEMA's 2010 coastal building guide requires deeply embedded pile or column foundations in V Zones and recommends them over slabs in A Zones, because it calls slabs more prone to scour, where moving water washes soil out from underneath, so if your lot is in one of those zones, raise it with your designer before anyone prices a slab. We see the same wet, shifting ground on jobs in Sulphur and Moss Bluff, and we work across Southwest Louisiana and into Orange, TX, so if your city isn't listed, ask us.